PROJECT QUARRY IN FRANCE

To realize this project in France, we worked for several months to reduce the slurry fraction to less than 63µm. The slurry appeared as a result of soil washing. Originally, people let it dry up at its own natural pace. With increased production capacity, this type of approach wasn’t any longer practicable. The first steps taken included mixing the liquid sludge with sand, which turned out to be way too expensive.