CURRENT PROJECT
A quarry in France To realize this project in France, we worked for several months to reduce the slurry fraction to less than 63µm. The slurry appeared as a result of soil washing. Originally, people let it dry up at its own natural pace. With increased production capacity, this type of approach wasn’t any longer practicable. First steps taken included mixing the flowing sludge with sand, which turned out to be way too expensive.
